US Bridges

El Charro RD over Arroyo Las Positas

Fair

Alameda County, California · 2000 Ft S of I-580 · Structure no. 33C0457

Built
2003
22 years old
Condition
Fair
inspected October 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete Continuous
Length
200 ft
2 main spans
Daily traffic
7,700
2023 count
Owner
City
City or Municipal Highway Agency

About this bridge

El Charro RD over Arroyo Las Positas is a prestressed concrete continuous box beam or girders - multiple carrying El Charro RD over Arroyo Las Positas in Alameda County, California. It was built in 2003, so it is 22 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 7,700 vehicles a day, roughly 10% of them trucks, projected to reach 14,674 by 2042. The structure is 200 ft (61 m) long and 36 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesEl Charro RD
CrossesArroyo Las Positas
Location2000 Ft S of I-580
RouteCity Street 0
Coordinates37.69381, -121.84818
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.6 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadUnknown
Structure length200 ft (61 m)
Longest span100 ft (30.4 m)
Deck width36 ft (11 m)
Roadway width32 ft (9.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic7,700 (2023)
Projected traffic14,674 by 2042
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesRelief for waterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was El Charro RD over Arroyo Las Positas built?

It was built in 2003, making it 22 years old in 2025.

What condition is El Charro RD over Arroyo Las Positas in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.

How much traffic does El Charro RD over Arroyo Las Positas carry?

About 7,700 vehicles per day (2023 count), of which roughly 10% are trucks.

How long is El Charro RD over Arroyo Las Positas?

The structure is 200 ft (61 m) long with a longest span of 100 ft (30.4 m) and a deck 36 ft wide.

Who owns El Charro RD over Arroyo Las Positas?

It is owned by the City or Municipal Highway Agency.