ST RTE 84 (isabel) over Arroyo Del Valle
GoodAlameda County, California · 04-ALA-084-R25.45-LVMR · Structure no. 33 0710
- Built
- 1983
- 42 years old, rebuilt 2019
- Condition
- Good
- inspected August 2023
- Type
- Tee Beam
- Concrete Continuous
- Length
- 123 ft
- 2 main spans
- Daily traffic
- 18,500
- 2010 count
- Owner
- State
- State Highway Agency
About this bridge
ST RTE 84 (isabel) over Arroyo Del Valle is a concrete continuous tee beam carrying ST RTE 84 (isabel) over Arroyo Del Valle in Alameda County, California. It was built in 1983 and reconstructed in 2019, so it is 42 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 18,500 vehicles a day, roughly 2% of them trucks, projected to reach 32,712 by 2043. The structure is 123 ft (37.5 m) long and 94 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was ST RTE 84 (isabel) over Arroyo Del Valle built?
It was built in 1983, making it 42 years old in 2025. It was reconstructed in 2019.
What condition is ST RTE 84 (isabel) over Arroyo Del Valle in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.
How much traffic does ST RTE 84 (isabel) over Arroyo Del Valle carry?
About 18,500 vehicles per day (2010 count), of which roughly 2% are trucks.
How long is ST RTE 84 (isabel) over Arroyo Del Valle?
The structure is 123 ft (37.5 m) long with a longest span of 60 ft (18.3 m) and a deck 94 ft wide.
Who owns ST RTE 84 (isabel) over Arroyo Del Valle?
It is owned by the State Highway Agency.