Stanley Blvd over Arroyo Mocho
GoodAlameda County, California · 0.1 MI W/O Murrieta Blvd · Structure no. 33C0070
- Built
- 1940
- 85 years old, rebuilt 1969
- Condition
- Good
- inspected November 2023
- Type
- Slab
- Concrete Continuous
- Length
- 126 ft
- 5 main spans
- Daily traffic
- 40,300
- 2009 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Stanley Blvd over Arroyo Mocho is a concrete continuous slab carrying Stanley Blvd over Arroyo Mocho in Alameda County, California. It was built in 1940 and reconstructed in 1969, so it is 85 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 40,300 vehicles a day, roughly 5% of them trucks, projected to reach 22,173 by 2041. The structure is 126 ft (38.4 m) long and 90 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Stanley Blvd over Arroyo Mocho built?
It was built in 1940, making it 85 years old in 2025. It was reconstructed in 1969.
What condition is Stanley Blvd over Arroyo Mocho in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.
How much traffic does Stanley Blvd over Arroyo Mocho carry?
About 40,300 vehicles per day (2009 count), of which roughly 5% are trucks.
How long is Stanley Blvd over Arroyo Mocho?
The structure is 126 ft (38.4 m) long with a longest span of 42 ft (12.8 m) and a deck 90 ft wide.
Who owns Stanley Blvd over Arroyo Mocho?
It is owned by the City or Municipal Highway Agency.