US Bridges

Route 580 EB over San Pblo Adln Mgno Per

Fair

Alameda County, California · 04-ALA-580-45.74-OAK · Structure no. 33 0280L

Built
1961
64 years old
Condition
Fair
inspected August 2024
Type
Box Beam or Girders - Multiple
Concrete Continuous
Length
1,071 ft
12 main spans
Daily traffic
99,000
2017 count
Owner
State
State Highway Agency

About this bridge

Route 580 EB over San Pblo Adln Mgno Per is a concrete continuous box beam or girders - multiple carrying Route 580 EB over San Pblo Adln Mgno Per in Alameda County, California. It was built in 1961, so it is 64 years old, older than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 99,000 vehicles a day, roughly 3% of them trucks, projected to reach 315,259 by 2042. The structure is 1,071 ft (326.5 m) long and 69 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesRoute 580 EB
CrossesSan Pblo Adln Mgno Per
Location04-ALA-580-45.74-OAK
RouteInterstate 580
Coordinates37.82659, -122.27802
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating65.7 US tons
Inventory rating39.2 US tons

Structure

MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans12
Design loadHS 20
Structure length1,071 ft (326.5 m)
Longest span121 ft (36.9 m)
Deck width69 ft (20.9 m)
Roadway width66 ft (20.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic99,000 (2017)
Projected traffic315,259 by 2042
Trucks3%
Lanes on structure5
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Route 580 EB over San Pblo Adln Mgno Per built?

It was built in 1961, making it 64 years old in 2025.

What condition is Route 580 EB over San Pblo Adln Mgno Per in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.

How much traffic does Route 580 EB over San Pblo Adln Mgno Per carry?

About 99,000 vehicles per day (2017 count), of which roughly 3% are trucks.

How long is Route 580 EB over San Pblo Adln Mgno Per?

The structure is 1,071 ft (326.5 m) long with a longest span of 121 ft (36.9 m) and a deck 69 ft wide.

Who owns Route 580 EB over San Pblo Adln Mgno Per?

It is owned by the State Highway Agency.