Ave 3E over UPRR
FairYuma County, Arizona · 1.0 MI N JCT B 8 · Structure no. 10686
- Built
- 1976
- 49 years old, rebuilt 2013
- Condition
- Fair
- inspected February 2025
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete Continuous
- Length
- 432 ft
- 6 main spans
- Daily traffic
- 11,910
- 2021 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Ave 3E over UPRR is a prestressed concrete continuous box beam or girders - multiple carrying Ave 3E over UPRR in Yuma County, Arizona. It was built in 1976 and reconstructed in 2013, so it is 49 years old, older than the Arizona average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 11,910 vehicles a day, roughly 20% of them trucks, projected to reach 11,920 by 2041. The structure is 432 ft (131.7 m) long and 98 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Ave 3E over UPRR built?
It was built in 1976, making it 49 years old in 2025. It was reconstructed in 2013.
What condition is Ave 3E over UPRR in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2025.
How much traffic does Ave 3E over UPRR carry?
About 11,910 vehicles per day (2021 count), of which roughly 20% are trucks.
How long is Ave 3E over UPRR?
The structure is 432 ft (131.7 m) long with a longest span of 85 ft (25.9 m) and a deck 98 ft wide.
Who owns Ave 3E over UPRR?
It is owned by the City or Municipal Highway Agency.