IRR BIA RTE 22 over Yuma East Main Canal
FairYuma County, Arizona · 3.2 KM South of Az HWY 95 · Structure no. 00000000000H037
- Built
- 1972
- 53 years old
- Condition
- Fair
- inspected February 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 65 ft
- 1 main span
- Daily traffic
- 210
- 2021 count
- Owner
- Federal
- Bureau of Indian Affairs
About this bridge
IRR BIA RTE 22 over Yuma East Main Canal is a prestressed concrete box beam or girders - multiple carrying IRR BIA RTE 22 over Yuma East Main Canal in Yuma County, Arizona. It was built in 1972, so it is 53 years old, older than the Arizona average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 210 vehicles a day, roughly 6% of them trucks, projected to reach 245 by 2038. The structure is 65 ft (19.7 m) long and 39 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IRR BIA RTE 22 over Yuma East Main Canal built?
It was built in 1972, making it 53 years old in 2025.
What condition is IRR BIA RTE 22 over Yuma East Main Canal in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.
How much traffic does IRR BIA RTE 22 over Yuma East Main Canal carry?
About 210 vehicles per day (2021 count), of which roughly 6% are trucks.
How long is IRR BIA RTE 22 over Yuma East Main Canal?
The structure is 65 ft (19.7 m) long with a longest span of 62 ft (18.8 m) and a deck 39 ft wide.
Who owns IRR BIA RTE 22 over Yuma East Main Canal?
It is owned by the Bureau of Indian Affairs.