US Bridges

Perkinsville Road over Government Canyon

Fair

Yavapai County, Arizona · 14.0 MI SE JCT SR 89 · Structure no. 09473

Built
1951
74 years old
Condition
Fair
inspected July 2023
Type
Slab
Concrete
Length
26 ft
1 main span
Daily traffic
90
2021 count
Owner
County
County Highway Agency

About this bridge

Perkinsville Road over Government Canyon is a concrete slab carrying Perkinsville Road over Government Canyon in Yavapai County, Arizona. It was built in 1951, so it is 74 years old, older than the Arizona average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 90 vehicles a day, projected to reach 100 by 2041. The structure is 26 ft (7.9 m) long and 16 ft wide. If it were closed, the detour would be 98.8 mi (159 km).

CarriesPerkinsville Road
CrossesGovernment Canyon
Location14.0 MI SE JCT SR 89
RouteCounty Highway 0
StateArizona
Coordinates34.9438, -112.2131
Functional classRural Minor Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating40 US tons
Inventory rating24 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length26 ft (7.9 m)
Longest span24 ft (7.3 m)
Deck width16 ft (4.9 m)
Roadway width14 ft (4.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic90 (2021)
Projected traffic100 by 2041
Trucks0%
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed98.8 mi (159 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$1,000 (2023 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Perkinsville Road over Government Canyon built?

It was built in 1951, making it 74 years old in 2025.

What condition is Perkinsville Road over Government Canyon in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.

How much traffic does Perkinsville Road over Government Canyon carry?

About 90 vehicles per day (2021 count).

How long is Perkinsville Road over Government Canyon?

The structure is 26 ft (7.9 m) long with a longest span of 24 ft (7.3 m) and a deck 16 ft wide.

Who owns Perkinsville Road over Government Canyon?

It is owned by the County Highway Agency.