I-17 NB over Agua Fria River
FairYavapai County, Arizona · 2.6 MI N JCT SR 69 · Structure no. 00382
- Built
- 1963
- 62 years old, rebuilt 1980
- Condition
- Fair
- inspected August 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 274 ft
- 3 main spans
- Daily traffic
- 14,573
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
I-17 NB over Agua Fria River is a steel continuous stringer/multi-beam or girder carrying I-17 NB over Agua Fria River in Yavapai County, Arizona. It was built in 1963 and reconstructed in 1980, so it is 62 years old, older than the Arizona average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 14,573 vehicles a day, roughly 10% of them trucks, projected to reach 14,583 by 2042. The structure is 274 ft (83.5 m) long and 45 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-17 NB over Agua Fria River built?
It was built in 1963, making it 62 years old in 2025. It was reconstructed in 1980.
What condition is I-17 NB over Agua Fria River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.
How much traffic does I-17 NB over Agua Fria River carry?
About 14,573 vehicles per day (2023 count), of which roughly 10% are trucks.
How long is I-17 NB over Agua Fria River?
The structure is 274 ft (83.5 m) long with a longest span of 103 ft (31.4 m) and a deck 45 ft wide.
Who owns I-17 NB over Agua Fria River?
It is owned by the State Highway Agency.