Morley Ave over Nogales Wash
FairPosted for loadSanta Cruz County, Arizona · 50 Ft E JCT B19 · Structure no. 08327
- Built
- 1930
- 95 years old, rebuilt 1944
- Condition
- Fair
- inspected January 2025
- Type
- Tee Beam
- Concrete
- Length
- 47 ft
- 1 main span
- Daily traffic
- 6,283
- 2022 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Morley Ave over Nogales Wash is a concrete tee beam carrying Morley Ave over Nogales Wash in Santa Cruz County, Arizona. It was built in 1930 and reconstructed in 1944, so it is 95 years old, older than the Arizona average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 6,283 vehicles a day, roughly 10% of them trucks, projected to reach 6,293 by 2042. The structure is 47 ft (14.3 m) long and 67 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Morley Ave over Nogales Wash built?
It was built in 1930, making it 95 years old in 2025. It was reconstructed in 1944.
What condition is Morley Ave over Nogales Wash in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2025.
How much traffic does Morley Ave over Nogales Wash carry?
About 6,283 vehicles per day (2022 count), of which roughly 10% are trucks.
How long is Morley Ave over Nogales Wash?
The structure is 47 ft (14.3 m) long with a longest span of 42 ft (12.8 m) and a deck 67 ft wide.
Who owns Morley Ave over Nogales Wash?
It is owned by the City or Municipal Highway Agency.