US Bridges

Veneto RD over Pima RD Drainage Channel

Good

Pinal County, Arizona · 0.01 MI S of Pima RD · Structure no. 11526

Built
2015
10 years old
Condition
Good
inspected November 2023
Type
Culvert
Concrete Continuous
Length
21 ft
2 main spans
Daily traffic
210
2023 count
Owner
County
County Highway Agency

About this bridge

Veneto RD over Pima RD Drainage Channel is a concrete continuous culvert carrying Veneto RD over Pima RD Drainage Channel in Pinal County, Arizona. It was built in 2015, so it is 10 years old, younger than the Arizona average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 210 vehicles a day, roughly 1% of them trucks, projected to reach 220 by 2042. The structure is 21 ft (6.4 m) long and 82 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesVeneto RD
CrossesPima RD Drainage Channel
Location0.01 MI S of Pima RD
RouteCounty Highway 0
StateArizona
Coordinates33.2633, -111.56015
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert8 Very GoodNo problems noted.
Last inspectionNovember 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating58 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckNot applicable
Main spans2
Design loadHS 20
Structure length21 ft (6.4 m)
Longest span10 ft (3 m)
Deck width82 ft (25 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic210 (2023)
Projected traffic220 by 2042
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Veneto RD over Pima RD Drainage Channel built?

It was built in 2015, making it 10 years old in 2025.

What condition is Veneto RD over Pima RD Drainage Channel in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does Veneto RD over Pima RD Drainage Channel carry?

About 210 vehicles per day (2023 count), of which roughly 1% are trucks.

How long is Veneto RD over Pima RD Drainage Channel?

The structure is 21 ft (6.4 m) long with a longest span of 10 ft (3 m) and a deck 82 ft wide.

Who owns Veneto RD over Pima RD Drainage Channel?

It is owned by the County Highway Agency.