Attaway Road over Pima Lateral Canal Br
GoodPinal County, Arizona · 0.5 MI S of Kenilworth RD · Structure no. 10356
- Built
- 2004
- 21 years old
- Condition
- Good
- inspected February 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 47 ft
- 1 main span
- Daily traffic
- 638
- 2020 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Attaway Road over Pima Lateral Canal Br is a prestressed concrete box beam or girders - multiple carrying Attaway Road over Pima Lateral Canal Br in Pinal County, Arizona. It was built in 2004, so it is 21 years old, younger than the Arizona average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 638 vehicles a day, roughly 5% of them trucks, projected to reach 648 by 2040. The structure is 47 ft (14.3 m) long and 36 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Attaway Road over Pima Lateral Canal Br built?
It was built in 2004, making it 21 years old in 2025.
What condition is Attaway Road over Pima Lateral Canal Br in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.
How much traffic does Attaway Road over Pima Lateral Canal Br carry?
About 638 vehicles per day (2020 count), of which roughly 5% are trucks.
How long is Attaway Road over Pima Lateral Canal Br?
The structure is 47 ft (14.3 m) long with a longest span of 44 ft (13.4 m) and a deck 36 ft wide.
Who owns Attaway Road over Pima Lateral Canal Br?
It is owned by the City or Municipal Highway Agency.