Baseline Avenue over Weeks Wash Channel
GoodPinal County, Arizona · 0.45 MI E of JCT Idaho RD · Structure no. 07727
- Built
- 1990
- 35 years old
- Condition
- Good
- inspected May 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 63 ft
- 1 main span
- Daily traffic
- 4,918
- 2019 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Baseline Avenue over Weeks Wash Channel is a prestressed concrete stringer/multi-beam or girder carrying Baseline Avenue over Weeks Wash Channel in Pinal County, Arizona. It was built in 1990, so it is 35 years old, younger than the Arizona average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 4,918 vehicles a day, roughly 17% of them trucks, projected to reach 4,928 by 2039. The structure is 63 ft (19.2 m) long and 40 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Baseline Avenue over Weeks Wash Channel built?
It was built in 1990, making it 35 years old in 2025.
What condition is Baseline Avenue over Weeks Wash Channel in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.
How much traffic does Baseline Avenue over Weeks Wash Channel carry?
About 4,918 vehicles per day (2019 count), of which roughly 17% are trucks.
How long is Baseline Avenue over Weeks Wash Channel?
The structure is 63 ft (19.2 m) long with a longest span of 61 ft (18.6 m) and a deck 40 ft wide.
Who owns Baseline Avenue over Weeks Wash Channel?
It is owned by the City or Municipal Highway Agency.