US Bridges

SR 79 over Wash

Good

Pinal County, Arizona · 11.5 MI S JCT SR 287 · Structure no. 04762

Built
1940
85 years old
Condition
Good
inspected March 2022
Type
Culvert
Concrete Continuous
Length
24 ft
2 main spans
Daily traffic
2,829
2021 count
Owner
State
State Highway Agency

About this bridge

SR 79 over Wash is a concrete continuous culvert carrying SR 79 over Wash in Pinal County, Arizona. It was built in 1940, so it is 85 years old, older than the Arizona average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,829 vehicles a day, roughly 11% of them trucks, projected to reach 2,839 by 2041. The structure is 24 ft (7.3 m) long and 87 ft wide. If it were closed, the detour would be 65.2 mi (105 km).

CarriesSR 79
CrossesWash
Location11.5 MI S JCT SR 287
RouteState Highway 79
StateArizona
Coordinates32.9017, -111.2796
Functional classRural Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert7 GoodSome minor problems.
Last inspectionMarch 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating58 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length24 ft (7.3 m)
Longest span10 ft (3 m)
Deck width87 ft (26.5 m)
Roadway width85 ft (25.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,829 (2021)
Projected traffic2,839 by 2041
Trucks11%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed65.2 mi (105 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 79 over Wash built?

It was built in 1940, making it 85 years old in 2025.

What condition is SR 79 over Wash in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2022.

How much traffic does SR 79 over Wash carry?

About 2,829 vehicles per day (2021 count), of which roughly 11% are trucks.

How long is SR 79 over Wash?

The structure is 24 ft (7.3 m) long with a longest span of 10 ft (3 m) and a deck 87 ft wide.

Who owns SR 79 over Wash?

It is owned by the State Highway Agency.