US Bridges

SR 77 over Wash

Good

Pinal County, Arizona · _ · Structure no. 04380

Built
2024
1 years old
Condition
Good
inspected January 2025
Type
Culvert
Concrete Continuous
Length
21 ft
2 main spans
Daily traffic
3,527
2025 count
Owner
State
State Highway Agency

About this bridge

SR 77 over Wash is a concrete continuous culvert carrying SR 77 over Wash in Pinal County, Arizona. It was built in 2024, so it is 1 years old, younger than the Arizona average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,527 vehicles a day, roughly 12% of them trucks, projected to reach 3,537 by 2042. The structure is 21 ft (6.4 m) long. If it were closed, the detour would be 24.2 mi (39 km).

CarriesSR 77
CrossesWash
Location_
RouteState Highway 77
StateArizona
Coordinates32.78221, -110.6669
Functional classRural Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert7 GoodSome minor problems.
Last inspectionJanuary 2025
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating99 US tons
Inventory rating99 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckNot applicable
Main spans2
Design loadHS 20
Structure length21 ft (6.4 m)
Longest span10 ft (3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,527 (2025)
Projected traffic3,537 by 2042
Trucks12%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed24.2 mi (39 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 77 over Wash built?

It was built in 2024, making it 1 years old in 2025.

What condition is SR 77 over Wash in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.

How much traffic does SR 77 over Wash carry?

About 3,527 vehicles per day (2025 count), of which roughly 12% are trucks.

How long is SR 77 over Wash?

The structure is 21 ft (6.4 m) long with a longest span of 10 ft (3 m).

Who owns SR 77 over Wash?

It is owned by the State Highway Agency.