Valencia Road over Pantano Wash
FairPima County, Arizona · 2 MI E of Houghton RD · Structure no. 11640
- Built
- 2020
- 5 years old
- Condition
- Fair
- inspected December 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 377 ft
- 3 main spans
- Daily traffic
- 653
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
Valencia Road over Pantano Wash is a prestressed concrete continuous stringer/multi-beam or girder carrying Valencia Road over Pantano Wash in Pima County, Arizona. It was built in 2020, so it is 5 years old, younger than the Arizona average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 653 vehicles a day, roughly 2% of them trucks, projected to reach 663 by 2042. The structure is 377 ft (114.9 m) long and 49 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Valencia Road over Pantano Wash built?
It was built in 2020, making it 5 years old in 2025.
What condition is Valencia Road over Pantano Wash in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2024.
How much traffic does Valencia Road over Pantano Wash carry?
About 653 vehicles per day (2022 count), of which roughly 2% are trucks.
How long is Valencia Road over Pantano Wash?
The structure is 377 ft (114.9 m) long with a longest span of 125 ft (38.1 m) and a deck 49 ft wide.
Who owns Valencia Road over Pantano Wash?
It is owned by the County Highway Agency.