River RD over Camino Real Wash
FairPima County, Arizona · At N Cmo Real Inter. · Structure no. 11505
- Built
- 2006
- 19 years old
- Condition
- Fair
- inspected September 2024
- Type
- Culvert
- Concrete Continuous
- Length
- 80 ft
- 4 main spans
- Daily traffic
- 1,510
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
River RD over Camino Real Wash is a concrete continuous culvert carrying River RD over Camino Real Wash in Pima County, Arizona. It was built in 2006, so it is 19 years old, younger than the Arizona average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,510 vehicles a day, roughly 1% of them trucks, projected to reach 1,520 by 2042. The structure is 80 ft (24.3 m) long and 102 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
| Culvert | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was River RD over Camino Real Wash built?
It was built in 2006, making it 19 years old in 2025.
What condition is River RD over Camino Real Wash in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does River RD over Camino Real Wash carry?
About 1,510 vehicles per day (2024 count), of which roughly 1% are trucks.
How long is River RD over Camino Real Wash?
The structure is 80 ft (24.3 m) long with a longest span of 8 ft (2.4 m) and a deck 102 ft wide.
Who owns River RD over Camino Real Wash?
It is owned by the County Highway Agency.