US Bridges

River RD over Camino Real Wash

Fair

Pima County, Arizona · At N Cmo Real Inter. · Structure no. 11505

Built
2006
19 years old
Condition
Fair
inspected September 2024
Type
Culvert
Concrete Continuous
Length
80 ft
4 main spans
Daily traffic
1,510
2024 count
Owner
County
County Highway Agency

About this bridge

River RD over Camino Real Wash is a concrete continuous culvert carrying River RD over Camino Real Wash in Pima County, Arizona. It was built in 2006, so it is 19 years old, younger than the Arizona average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 1,510 vehicles a day, roughly 1% of them trucks, projected to reach 1,520 by 2042. The structure is 80 ft (24.3 m) long and 102 ft wide.

CarriesRiver RD
CrossesCamino Real Wash
LocationAt N Cmo Real Inter.
RouteCounty Highway 0
StateArizona
Coordinates32.28659, -110.93683
Functional classUrban Other Principal Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionSeptember 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating95 US tons
Inventory rating56 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckNot applicable
Main spans4
Design loadHS 20
Structure length80 ft (24.3 m)
Longest span8 ft (2.4 m)
Deck width102 ft (31.2 m)
Roadway width67 ft (20.3 m)
Vertical clearance over deck100 ft (30.5 m)

Traffic and service

Average daily traffic1,510 (2024)
Projected traffic1,520 by 2042
Trucks1%
Lanes on structure5
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was River RD over Camino Real Wash built?

It was built in 2006, making it 19 years old in 2025.

What condition is River RD over Camino Real Wash in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.

How much traffic does River RD over Camino Real Wash carry?

About 1,510 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is River RD over Camino Real Wash?

The structure is 80 ft (24.3 m) long with a longest span of 8 ft (2.4 m) and a deck 102 ft wide.

Who owns River RD over Camino Real Wash?

It is owned by the County Highway Agency.