US Bridges

Bromley ST over Manor Wash

Fair

Pima County, Arizona · 150 Ft W Geronimo RD · Structure no. 08269

Built
1968
57 years old
Condition
Fair
inspected February 2024
Type
Culvert
Concrete Continuous
Length
21 ft
2 main spans
Daily traffic
200
2022 count
Owner
County
County Highway Agency

About this bridge

Bromley ST over Manor Wash is a concrete continuous culvert carrying Bromley ST over Manor Wash in Pima County, Arizona. It was built in 1968, so it is 57 years old, older than the Arizona average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 200 vehicles a day, roughly 2% of them trucks, projected to reach 210 by 2042. The structure is 21 ft (6.4 m) long and 42 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesBromley ST
CrossesManor Wash
Location150 Ft W Geronimo RD
RouteCounty Highway 0
StateArizona
Coordinates32.29339, -110.96615
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionFebruary 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment6: Equal to present minimum criteria
Operating rating59 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length21 ft (6.4 m)
Longest span10 ft (3 m)
Deck width42 ft (12.8 m)
Roadway width34 ft (10.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic200 (2022)
Projected traffic210 by 2042
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Bromley ST over Manor Wash built?

It was built in 1968, making it 57 years old in 2025.

What condition is Bromley ST over Manor Wash in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.

How much traffic does Bromley ST over Manor Wash carry?

About 200 vehicles per day (2022 count), of which roughly 2% are trucks.

How long is Bromley ST over Manor Wash?

The structure is 21 ft (6.4 m) long with a longest span of 10 ft (3 m) and a deck 42 ft wide.

Who owns Bromley ST over Manor Wash?

It is owned by the County Highway Agency.