SR 210 EB over Euclid/Park Ave
FairPima County, Arizona · 1.6 MI E JCT I 10 · Structure no. 02146
- Built
- 1998
- 27 years old
- Condition
- Fair
- inspected August 2024
- Type
- Box Beam or Girders - Single or Spread
- Prestressed Concrete Continuous
- Length
- 269 ft
- 2 main spans
- Daily traffic
- 9,842
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
SR 210 EB over Euclid/Park Ave is a prestressed concrete continuous box beam or girders - single or spread carrying SR 210 EB over Euclid/Park Ave in Pima County, Arizona. It was built in 1998, so it is 27 years old, younger than the Arizona average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 9,842 vehicles a day, roughly 7% of them trucks, projected to reach 9,854 by 2042. The structure is 269 ft (82 m) long and 63 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 210 EB over Euclid/Park Ave built?
It was built in 1998, making it 27 years old in 2025.
What condition is SR 210 EB over Euclid/Park Ave in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does SR 210 EB over Euclid/Park Ave carry?
About 9,842 vehicles per day (2024 count), of which roughly 7% are trucks.
How long is SR 210 EB over Euclid/Park Ave?
The structure is 269 ft (82 m) long with a longest span of 130 ft (39.6 m) and a deck 63 ft wide.
Who owns SR 210 EB over Euclid/Park Ave?
It is owned by the State Highway Agency.