US Bridges

Kino Pkwy Ramp over Vegetated Ground

Fair

Pima County, Arizona · 2.5 MI N of JCT I 10 · Structure no. 02121

Built
1993
32 years old
Condition
Fair
inspected August 2022
Type
Box Beam or Girders - Single or Spread
Prestressed Concrete Continuous
Length
387 ft
3 main spans
Daily traffic
2,103
2017 count
Owner
State
State Highway Agency

About this bridge

Kino Pkwy Ramp over Vegetated Ground is a prestressed concrete continuous box beam or girders - single or spread carrying Kino Pkwy Ramp over Vegetated Ground in Pima County, Arizona. It was built in 1993, so it is 32 years old, younger than the Arizona average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 2,103 vehicles a day, roughly 7% of them trucks, projected to reach 2,113 by 2037. The structure is 387 ft (118 m) long and 31 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesKino Pkwy Ramp
CrossesVegetated Ground
Location2.5 MI N of JCT I 10
RouteState Highway 210
StateArizona
Coordinates32.2106, -110.9476
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Last inspectionAugust 2022
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Approach roadway alignment7: Better than present minimum criteria
Operating rating72 US tons
Inventory rating43 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3 (+1 approach)
Design loadHS 20
Structure length387 ft (118 m)
Longest span145 ft (44.2 m)
Deck width31 ft (9.4 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,103 (2017)
Projected traffic2,113 by 2037
Trucks7%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesOther
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Kino Pkwy Ramp over Vegetated Ground built?

It was built in 1993, making it 32 years old in 2025.

What condition is Kino Pkwy Ramp over Vegetated Ground in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2022.

How much traffic does Kino Pkwy Ramp over Vegetated Ground carry?

About 2,103 vehicles per day (2017 count), of which roughly 7% are trucks.

How long is Kino Pkwy Ramp over Vegetated Ground?

The structure is 387 ft (118 m) long with a longest span of 145 ft (44.2 m) and a deck 31 ft wide.

Who owns Kino Pkwy Ramp over Vegetated Ground?

It is owned by the State Highway Agency.