I-40; Sfr over Manila Wash
FairNavajo County, Arizona · 13.9 MI E JCT SR 87 · Structure no. 02080
- Built
- 1949
- 76 years old
- Condition
- Fair
- inspected May 2023
- Type
- Tee Beam
- Concrete
- Length
- 76 ft
- 2 main spans
- Daily traffic
- 210
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
I-40; Sfr over Manila Wash is a concrete tee beam carrying I-40; Sfr over Manila Wash in Navajo County, Arizona. It was built in 1949, so it is 76 years old, older than the Arizona average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 210 vehicles a day, roughly 5% of them trucks, projected to reach 220 by 2041. The structure is 76 ft (23.2 m) long and 45 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-40; Sfr over Manila Wash built?
It was built in 1949, making it 76 years old in 2025.
What condition is I-40; Sfr over Manila Wash in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.
How much traffic does I-40; Sfr over Manila Wash carry?
About 210 vehicles per day (2021 count), of which roughly 5% are trucks.
How long is I-40; Sfr over Manila Wash?
The structure is 76 ft (23.2 m) long with a longest span of 37 ft (11.3 m) and a deck 45 ft wide.
Who owns I-40; Sfr over Manila Wash?
It is owned by the State Highway Agency.