US Bridges

I-40 EB over 8th Avenue

Fair

Navajo County, Arizona · 6.3 MI W JCT SR 77 · Structure no. 01364

Built
1969
56 years old
Condition
Fair
inspected June 2023
Type
Slab
Concrete Continuous
Length
119 ft
3 main spans
Daily traffic
9,620
2021 count
Owner
State
State Highway Agency

About this bridge

I-40 EB over 8th Avenue is a concrete continuous slab carrying I-40 EB over 8th Avenue in Navajo County, Arizona. It was built in 1969, so it is 56 years old, older than the Arizona average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 9,620 vehicles a day, roughly 42% of them trucks, projected to reach 9,630 by 2041. The structure is 119 ft (36.3 m) long and 41 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI-40 EB
Crosses8th Avenue
Location6.3 MI W JCT SR 77
RouteInterstate 40
StateArizona
Coordinates34.91069, -110.16929
Functional classRural Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure8 Very GoodNo problems noted.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating57 US tons
Inventory rating34 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length119 ft (36.3 m)
Longest span42 ft (12.8 m)
Deck width41 ft (12.4 m)
Roadway width38 ft (11.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic9,620 (2021)
Projected traffic9,630 by 2041
Trucks42%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$320,000 (2023 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-40 EB over 8th Avenue built?

It was built in 1969, making it 56 years old in 2025.

What condition is I-40 EB over 8th Avenue in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.

How much traffic does I-40 EB over 8th Avenue carry?

About 9,620 vehicles per day (2021 count), of which roughly 42% are trucks.

How long is I-40 EB over 8th Avenue?

The structure is 119 ft (36.3 m) long with a longest span of 42 ft (12.8 m) and a deck 41 ft wide.

Who owns I-40 EB over 8th Avenue?

It is owned by the State Highway Agency.