US 60 over Rocky Arroyo
FairNavajo County, Arizona · 6.0 MI W JCT SR 61 · Structure no. 00384
- Built
- 1936
- 89 years old, rebuilt 1952
- Condition
- Fair
- inspected October 2024
- Type
- Tee Beam
- Concrete
- Length
- 108 ft
- 3 main spans
- Daily traffic
- 7,792
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
US 60 over Rocky Arroyo is a concrete tee beam carrying US 60 over Rocky Arroyo in Navajo County, Arizona. It was built in 1936 and reconstructed in 1952, so it is 89 years old, older than the Arizona average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 7,792 vehicles a day, roughly 14% of them trucks, projected to reach 7,802 by 2042. The structure is 108 ft (32.9 m) long and 38 ft wide. If it were closed, the detour would be 26.1 mi (42 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US 60 over Rocky Arroyo built?
It was built in 1936, making it 89 years old in 2025. It was reconstructed in 1952.
What condition is US 60 over Rocky Arroyo in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.
How much traffic does US 60 over Rocky Arroyo carry?
About 7,792 vehicles per day (2022 count), of which roughly 14% are trucks.
How long is US 60 over Rocky Arroyo?
The structure is 108 ft (32.9 m) long with a longest span of 36 ft (11 m) and a deck 38 ft wide.
Who owns US 60 over Rocky Arroyo?
It is owned by the State Highway Agency.