IRR BIA RTE 3 over Cibecue Creek
FairNavajo County, Arizona · 4.7 KM South of Cibecue · Structure no. 00000000000H085
- Built
- 1979
- 46 years old
- Condition
- Fair
- inspected February 2024
- Type
- Stringer/Multi-beam or Girder
- Concrete Continuous
- Length
- 230 ft
- 3 main spans
- Daily traffic
- 150
- 2021 count
- Owner
- Federal
- Bureau of Indian Affairs
About this bridge
IRR BIA RTE 3 over Cibecue Creek is a concrete continuous stringer/multi-beam or girder carrying IRR BIA RTE 3 over Cibecue Creek in Navajo County, Arizona. It was built in 1979, so it is 46 years old, younger than the Arizona average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 150 vehicles a day, roughly 5% of them trucks, projected to reach 195 by 2044. The structure is 230 ft (70.1 m) long and 41 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 3 Serious | Loss of section, deterioration, spalling or scour have seriously affected primary structural components. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IRR BIA RTE 3 over Cibecue Creek built?
It was built in 1979, making it 46 years old in 2025.
What condition is IRR BIA RTE 3 over Cibecue Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.
How much traffic does IRR BIA RTE 3 over Cibecue Creek carry?
About 150 vehicles per day (2021 count), of which roughly 5% are trucks.
How long is IRR BIA RTE 3 over Cibecue Creek?
The structure is 230 ft (70.1 m) long with a longest span of 88 ft (26.8 m) and a deck 41 ft wide.
Who owns IRR BIA RTE 3 over Cibecue Creek?
It is owned by the Bureau of Indian Affairs.