I 40; EB over Sfrr @ Yucca
FairMohave County, Arizona · 17.2 MI East JCT SR 95 · Structure no. 00925
- Built
- 1966
- 59 years old, rebuilt 1989
- Condition
- Fair
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 219 ft
- 3 main spans
- Daily traffic
- 8,100
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
I 40; EB over Sfrr @ Yucca is a steel continuous stringer/multi-beam or girder carrying I 40; EB over Sfrr @ Yucca in Mohave County, Arizona. It was built in 1966 and reconstructed in 1989, so it is 59 years old, older than the Arizona average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 8,100 vehicles a day, roughly 26% of them trucks, projected to reach 8,110 by 2042. The structure is 219 ft (66.8 m) long and 45 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I 40; EB over Sfrr @ Yucca built?
It was built in 1966, making it 59 years old in 2025. It was reconstructed in 1989.
What condition is I 40; EB over Sfrr @ Yucca in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.
How much traffic does I 40; EB over Sfrr @ Yucca carry?
About 8,100 vehicles per day (2022 count), of which roughly 26% are trucks.
How long is I 40; EB over Sfrr @ Yucca?
The structure is 219 ft (66.8 m) long with a longest span of 82 ft (25 m) and a deck 45 ft wide.
Who owns I 40; EB over Sfrr @ Yucca?
It is owned by the State Highway Agency.