I-40 WB over Franconia Wash
FairMohave County, Arizona · 3.8 MI E JCT SR 95 · Structure no. 00377
- Built
- 1951
- 74 years old, rebuilt 1972
- Condition
- Fair
- inspected May 2024
- Type
- Slab
- Concrete Continuous
- Length
- 164 ft
- 7 main spans
- Daily traffic
- 7,302
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
I-40 WB over Franconia Wash is a concrete continuous slab carrying I-40 WB over Franconia Wash in Mohave County, Arizona. It was built in 1951 and reconstructed in 1972, so it is 74 years old, older than the Arizona average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 7,302 vehicles a day, roughly 56% of them trucks, projected to reach 7,312 by 2042. The structure is 164 ft (50 m) long and 45 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-40 WB over Franconia Wash built?
It was built in 1951, making it 74 years old in 2025. It was reconstructed in 1972.
What condition is I-40 WB over Franconia Wash in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.
How much traffic does I-40 WB over Franconia Wash carry?
About 7,302 vehicles per day (2022 count), of which roughly 56% are trucks.
How long is I-40 WB over Franconia Wash?
The structure is 164 ft (50 m) long with a longest span of 25 ft (7.6 m) and a deck 45 ft wide.
Who owns I-40 WB over Franconia Wash?
It is owned by the State Highway Agency.