US Bridges

IRR BIA RTE 23 over Colorado River

Fair

Mohave County, Arizona · 3.65 KM West of Ft Mojave · Structure no. 0000H51604B0047

Built
1994
31 years old
Condition
Fair
inspected February 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
555 ft
4 main spans
Daily traffic
1,500
2024 count
Owner
Federal
Bureau of Indian Affairs

About this bridge

IRR BIA RTE 23 over Colorado River is a prestressed concrete stringer/multi-beam or girder carrying IRR BIA RTE 23 over Colorado River in Mohave County, Arizona. It was built in 1994, so it is 31 years old, younger than the Arizona average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 1,500 vehicles a day, roughly 5% of them trucks, projected to reach 1,600 by 2044. The structure is 555 ft (169.1 m) long and 35 ft wide. If it were closed, the detour would be 29.2 mi (47 km).

CarriesIRR BIA RTE 23
CrossesColorado River
Location3.65 KM West of Ft Mojave
RouteFederal Lands Road 23
StateArizona
Coordinates35.01393, -114.63762
Functional classRural Major Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating48.5 US tons
Inventory rating35.9 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20 + Mod
Structure length555 ft (169.1 m)
Longest span139 ft (42.3 m)
Deck width35 ft (10.6 m)
Roadway width31 ft (9.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,500 (2024)
Projected traffic1,600 by 2044
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed29.2 mi (47 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerBureau of Indian Affairs
Maintained byBureau of Indian Affairs
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was IRR BIA RTE 23 over Colorado River built?

It was built in 1994, making it 31 years old in 2025.

What condition is IRR BIA RTE 23 over Colorado River in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.

How much traffic does IRR BIA RTE 23 over Colorado River carry?

About 1,500 vehicles per day (2024 count), of which roughly 5% are trucks.

How long is IRR BIA RTE 23 over Colorado River?

The structure is 555 ft (169.1 m) long with a longest span of 139 ft (42.3 m) and a deck 35 ft wide.

Who owns IRR BIA RTE 23 over Colorado River?

It is owned by the Bureau of Indian Affairs.