Bell RD EB over Reata Pass Wash
GoodMaricopa County, Arizona · W of N 98th ST · Structure no. 11250
- Built
- 1995
- 30 years old
- Condition
- Good
- inspected March 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 268 ft
- 4 main spans
- Daily traffic
- 7,300
- 2022 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Bell RD EB over Reata Pass Wash is a prestressed concrete box beam or girders - multiple carrying Bell RD EB over Reata Pass Wash in Maricopa County, Arizona. It was built in 1995, so it is 30 years old, younger than the Arizona average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 7,300 vehicles a day, roughly 7% of them trucks, projected to reach 7,310 by 2042. The structure is 268 ft (81.7 m) long and 40 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Bell RD EB over Reata Pass Wash built?
It was built in 1995, making it 30 years old in 2025.
What condition is Bell RD EB over Reata Pass Wash in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.
How much traffic does Bell RD EB over Reata Pass Wash carry?
About 7,300 vehicles per day (2022 count), of which roughly 7% are trucks.
How long is Bell RD EB over Reata Pass Wash?
The structure is 268 ft (81.7 m) long with a longest span of 66 ft (20.1 m) and a deck 40 ft wide.
Who owns Bell RD EB over Reata Pass Wash?
It is owned by the City or Municipal Highway Agency.