US Bridges

94th ST over Westworld Ditch

Good

Maricopa County, Arizona · N of West World Way · Structure no. 11242

Built
2003
22 years old
Condition
Good
inspected January 2025
Type
Culvert
Concrete Continuous
Length
24 ft
2 main spans
Daily traffic
6,200
2018 count
Owner
City
City or Municipal Highway Agency

About this bridge

94th ST over Westworld Ditch is a concrete continuous culvert carrying 94th ST over Westworld Ditch in Maricopa County, Arizona. It was built in 2003, so it is 22 years old, younger than the Arizona average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 6,200 vehicles a day, roughly 2% of them trucks, projected to reach 6,210 by 2038. The structure is 24 ft (7.3 m) long.

Carries94th ST
CrossesWestworld Ditch
LocationN of West World Way
RouteCity Street 0
StateArizona
Coordinates33.6331, -111.8784
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert8 Very GoodNo problems noted.
Last inspectionJanuary 2025
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating71 US tons
Inventory rating42 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckNot applicable
Main spans2
Design loadHS 20
Structure length24 ft (7.3 m)
Longest span10 ft (3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,200 (2018)
Projected traffic6,210 by 2038
Trucks2%
Lanes on structure3
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was 94th ST over Westworld Ditch built?

It was built in 2003, making it 22 years old in 2025.

What condition is 94th ST over Westworld Ditch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.

How much traffic does 94th ST over Westworld Ditch carry?

About 6,200 vehicles per day (2018 count), of which roughly 2% are trucks.

How long is 94th ST over Westworld Ditch?

The structure is 24 ft (7.3 m) long with a longest span of 10 ft (3 m).

Who owns 94th ST over Westworld Ditch?

It is owned by the City or Municipal Highway Agency.