Greenway-Hayden RD over Cap Canal
FairMaricopa County, Arizona · N of Frank-Lloyd Wr · Structure no. 11236
- Built
- 1996
- 29 years old
- Condition
- Fair
- inspected December 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 94 ft
- 1 main span
- Daily traffic
- 21,532
- 2023 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Greenway-Hayden RD over Cap Canal is a prestressed concrete stringer/multi-beam or girder carrying Greenway-Hayden RD over Cap Canal in Maricopa County, Arizona. It was built in 1996, so it is 29 years old, younger than the Arizona average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 21,532 vehicles a day, roughly 5% of them trucks, projected to reach 21,542 by 2042. The structure is 94 ft (28.7 m) long and 110 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Greenway-Hayden RD over Cap Canal built?
It was built in 1996, making it 29 years old in 2025.
What condition is Greenway-Hayden RD over Cap Canal in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2024.
How much traffic does Greenway-Hayden RD over Cap Canal carry?
About 21,532 vehicles per day (2023 count), of which roughly 5% are trucks.
How long is Greenway-Hayden RD over Cap Canal?
The structure is 94 ft (28.7 m) long with a longest span of 90 ft (27.4 m) and a deck 110 ft wide.
Who owns Greenway-Hayden RD over Cap Canal?
It is owned by the City or Municipal Highway Agency.