US Bridges

Park ENTR/84th ST over Channel

Fair

Maricopa County, Arizona · Park ENTR/84th ST · Structure no. 11234

Built
1991
34 years old
Condition
Fair
inspected January 2025
Type
Culvert
Concrete Continuous
Length
26 ft
3 main spans
Daily traffic
420
2018 count
Owner
City
City or Municipal Highway Agency

About this bridge

Park ENTR/84th ST over Channel is a concrete continuous culvert carrying Park ENTR/84th ST over Channel in Maricopa County, Arizona. It was built in 1991, so it is 34 years old, younger than the Arizona average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 420 vehicles a day, roughly 2% of them trucks, projected to reach 430 by 2038. The structure is 26 ft (7.9 m) long. If it were closed, the detour would be 1.9 mi (3 km).

Location

No coordinates are recorded for this structure.

CarriesPark ENTR/84th ST
CrossesChannel
LocationPark ENTR/84th ST
RouteCity Street 0
StateArizona
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJanuary 2025
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating82 US tons
Inventory rating49.1 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckNot applicable
Main spans3
Design loadHS 20
Structure length26 ft (7.9 m)
Longest span8 ft (2.4 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic420 (2018)
Projected traffic430 by 2038
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Park ENTR/84th ST over Channel built?

It was built in 1991, making it 34 years old in 2025.

What condition is Park ENTR/84th ST over Channel in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2025.

How much traffic does Park ENTR/84th ST over Channel carry?

About 420 vehicles per day (2018 count), of which roughly 2% are trucks.

How long is Park ENTR/84th ST over Channel?

The structure is 26 ft (7.9 m) long with a longest span of 8 ft (2.4 m).

Who owns Park ENTR/84th ST over Channel?

It is owned by the City or Municipal Highway Agency.