US Bridges

Horne Street over Consolidated Canal

Fair

Maricopa County, Arizona · 0.4 MI S JCT Mckellips RD · Structure no. 09605

Built
1979
46 years old
Condition
Fair
inspected September 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
103 ft
2 main spans
Daily traffic
6,242
2023 count
Owner
City
City or Municipal Highway Agency

About this bridge

Horne Street over Consolidated Canal is a prestressed concrete continuous stringer/multi-beam or girder carrying Horne Street over Consolidated Canal in Maricopa County, Arizona. It was built in 1979, so it is 46 years old, younger than the Arizona average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 6,242 vehicles a day, roughly 5% of them trucks, projected to reach 6,252 by 2042. The structure is 103 ft (31.4 m) long and 67 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesHorne Street
CrossesConsolidated Canal
Location0.4 MI S JCT Mckellips RD
RouteCity Street 0
StateArizona
Coordinates33.445, -111.8138
Functional classUrban Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating61 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length103 ft (31.4 m)
Longest span50 ft (15.2 m)
Deck width67 ft (20.3 m)
Roadway width48 ft (14.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,242 (2023)
Projected traffic6,252 by 2042
Trucks5%
Lanes on structure3
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Horne Street over Consolidated Canal built?

It was built in 1979, making it 46 years old in 2025.

What condition is Horne Street over Consolidated Canal in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.

How much traffic does Horne Street over Consolidated Canal carry?

About 6,242 vehicles per day (2023 count), of which roughly 5% are trucks.

How long is Horne Street over Consolidated Canal?

The structure is 103 ft (31.4 m) long with a longest span of 50 ft (15.2 m) and a deck 67 ft wide.

Who owns Horne Street over Consolidated Canal?

It is owned by the City or Municipal Highway Agency.