Chandler Hts over E. Maricopa Fldwy
FairMaricopa County, Arizona · 100 E of Greenfield · Structure no. 09409
- Built
- 1975
- 50 years old, rebuilt 2011
- Condition
- Fair
- inspected December 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 316 ft
- 4 main spans
- Daily traffic
- 26,649
- 2021 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
Chandler Hts over E. Maricopa Fldwy is a prestressed concrete continuous stringer/multi-beam or girder carrying Chandler Hts over E. Maricopa Fldwy in Maricopa County, Arizona. It was built in 1975 and reconstructed in 2011, so it is 50 years old, older than the Arizona average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 26,649 vehicles a day, roughly 10% of them trucks, projected to reach 26,659 by 2041. The structure is 316 ft (96.3 m) long and 84 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Chandler Hts over E. Maricopa Fldwy built?
It was built in 1975, making it 50 years old in 2025. It was reconstructed in 2011.
What condition is Chandler Hts over E. Maricopa Fldwy in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2024.
How much traffic does Chandler Hts over E. Maricopa Fldwy carry?
About 26,649 vehicles per day (2021 count), of which roughly 10% are trucks.
How long is Chandler Hts over E. Maricopa Fldwy?
The structure is 316 ft (96.3 m) long with a longest span of 78 ft (23.8 m) and a deck 84 ft wide.
Who owns Chandler Hts over E. Maricopa Fldwy?
It is owned by the Town or Township Highway Agency.