US Bridges

Southwest Overpass over Sky Harbor Boulevard WB

Fair

Maricopa County, Arizona · Sky Harbor Airport Term 3 · Structure no. 08526

Built
1979
46 years old
Condition
Fair
inspected February 2023
Type
Girder and Floorbeam System
Concrete
Length
126 ft
2 main spans
Daily traffic
100
2020 count
Owner
City
City or Municipal Highway Agency

About this bridge

Southwest Overpass over Sky Harbor Boulevard WB is a concrete girder and floorbeam system carrying Southwest Overpass over Sky Harbor Boulevard WB in Maricopa County, Arizona. It was built in 1979, so it is 46 years old, younger than the Arizona average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 100 vehicles a day, roughly 1% of them trucks, projected to reach 110 by 2040. The structure is 126 ft (38.4 m) long and 34 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesSouthwest Overpass
CrossesSky Harbor Boulevard WB
LocationSky Harbor Airport Term 3
StateArizona
Coordinates33.4349, -112.0096
Functional classUrban Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionFebruary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating59.5 US tons
Inventory rating35.6 US tons

Structure

MaterialConcrete
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length126 ft (38.4 m)
Longest span67 ft (20.4 m)
Deck width34 ft (10.5 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic100 (2020)
Projected traffic110 by 2040
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$1,000 (2021 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was Southwest Overpass over Sky Harbor Boulevard WB built?

It was built in 1979, making it 46 years old in 2025.

What condition is Southwest Overpass over Sky Harbor Boulevard WB in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2023.

How much traffic does Southwest Overpass over Sky Harbor Boulevard WB carry?

About 100 vehicles per day (2020 count), of which roughly 1% are trucks.

How long is Southwest Overpass over Sky Harbor Boulevard WB?

The structure is 126 ft (38.4 m) long with a longest span of 67 ft (20.4 m) and a deck 34 ft wide.

Who owns Southwest Overpass over Sky Harbor Boulevard WB?

It is owned by the City or Municipal Highway Agency.