Deer Valley RD over Wash
FairMaricopa County, Arizona · 2.8 MI SW of Grand Avenue · Structure no. 07553
- Built
- 1988
- 37 years old
- Condition
- Fair
- inspected August 2023
- Type
- Slab
- Concrete Continuous
- Length
- 165 ft
- 3 main spans
- Daily traffic
- 1,621
- 2022 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
Deer Valley RD over Wash is a concrete continuous slab carrying Deer Valley RD over Wash in Maricopa County, Arizona. It was built in 1988, so it is 37 years old, younger than the Arizona average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,621 vehicles a day, roughly 40% of them trucks, projected to reach 1,631 by 2042. The structure is 165 ft (50.3 m) long and 52 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Deer Valley RD over Wash built?
It was built in 1988, making it 37 years old in 2025.
What condition is Deer Valley RD over Wash in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.
How much traffic does Deer Valley RD over Wash carry?
About 1,621 vehicles per day (2022 count), of which roughly 40% are trucks.
How long is Deer Valley RD over Wash?
The structure is 165 ft (50.3 m) long with a longest span of 62 ft (18.9 m) and a deck 52 ft wide.
Who owns Deer Valley RD over Wash?
It is owned by the Town or Township Highway Agency.