US Bridges

Williams Gatewy FR over Ray Road

Good

Maricopa County, Arizona · Ray RD & SR24 · Structure no. 02567

Built
2022
3 years old
Condition
Good
inspected June 2024
Type
Stringer/Multi-beam or Girder
Concrete Continuous
Length
247 ft
2 main spans
Daily traffic
45,857
2020 count
Owner
State
State Highway Agency

About this bridge

Williams Gatewy FR over Ray Road is a concrete continuous stringer/multi-beam or girder carrying Williams Gatewy FR over Ray Road in Maricopa County, Arizona. It was built in 2022, so it is 3 years old, younger than the Arizona average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 45,857 vehicles a day, roughly 6% of them trucks, projected to reach 50,901 by 2040. The structure is 247 ft (75.3 m) long and 161 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesWilliams Gatewy FR
CrossesRay Road
LocationRay RD & SR24
RouteState Highway 24
StateArizona
Coordinates33.3234, -111.6447
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating99 US tons
Inventory rating63.1 US tons

Structure

MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length247 ft (75.3 m)
Longest span121 ft (36.9 m)
Deck width161 ft (49.1 m)
Roadway width155 ft (47.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic45,857 (2020)
Projected traffic50,901 by 2040
Trucks6%
Lanes on structure6
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Williams Gatewy FR over Ray Road built?

It was built in 2022, making it 3 years old in 2025.

What condition is Williams Gatewy FR over Ray Road in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does Williams Gatewy FR over Ray Road carry?

About 45,857 vehicles per day (2020 count), of which roughly 6% are trucks.

How long is Williams Gatewy FR over Ray Road?

The structure is 247 ft (75.3 m) long with a longest span of 121 ft (36.9 m) and a deck 161 ft wide.

Who owns Williams Gatewy FR over Ray Road?

It is owned by the State Highway Agency.