Ramp S to E over East Frontage Road
FairMaricopa County, Arizona · SE Quadrant of 101/60 Ti · Structure no. 02107
- Built
- 1998
- 27 years old
- Condition
- Fair
- inspected January 2024
- Type
- Box Beam or Girders - Single or Spread
- Prestressed Concrete Continuous
- Length
- 843 ft
- 8 main spans
- Daily traffic
- 13,905
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
Ramp S to E over East Frontage Road is a prestressed concrete continuous box beam or girders - single or spread carrying Ramp S to E over East Frontage Road in Maricopa County, Arizona. It was built in 1998, so it is 27 years old, younger than the Arizona average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 13,905 vehicles a day, roughly 7% of them trucks, projected to reach 13,915 by 2042. The structure is 843 ft (256.9 m) long and 31 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Ramp S to E over East Frontage Road built?
It was built in 1998, making it 27 years old in 2025.
What condition is Ramp S to E over East Frontage Road in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.
How much traffic does Ramp S to E over East Frontage Road carry?
About 13,905 vehicles per day (2022 count), of which roughly 7% are trucks.
How long is Ramp S to E over East Frontage Road?
The structure is 843 ft (256.9 m) long with a longest span of 115 ft (35.1 m) and a deck 31 ft wide.
Who owns Ramp S to E over East Frontage Road?
It is owned by the State Highway Agency.