US Bridges

BLM Road over Cap Canal

Fair

Maricopa County, Arizona · @ Cap Milepost 96.353 · Structure no. 00993

Built
1982
43 years old
Condition
Fair
inspected February 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
85 ft
1 main span
Daily traffic
25
2024 count
Owner
State
Other State Agency

About this bridge

BLM Road over Cap Canal is a prestressed concrete stringer/multi-beam or girder carrying BLM Road over Cap Canal in Maricopa County, Arizona. It was built in 1982, so it is 43 years old, younger than the Arizona average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 25 vehicles a day, projected to reach 35 by 2042. The structure is 85 ft (25.9 m) long and 23 ft wide. If it were closed, the detour would be 98.8 mi (159 km).

CarriesBLM Road
CrossesCap Canal
Location@ Cap Milepost 96.353
RouteFederal Lands Road 0
StateArizona
Coordinates33.54256, -113.04686
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating75 US tons
Inventory rating38 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length85 ft (25.9 m)
Longest span83 ft (25.3 m)
Deck width23 ft (7 m)
Roadway width20 ft (6.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic25 (2024)
Projected traffic35 by 2042
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed98.8 mi (159 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerOther State Agency
Maintained byOther State Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was BLM Road over Cap Canal built?

It was built in 1982, making it 43 years old in 2025.

What condition is BLM Road over Cap Canal in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.

How much traffic does BLM Road over Cap Canal carry?

About 25 vehicles per day (2024 count).

How long is BLM Road over Cap Canal?

The structure is 85 ft (25.9 m) long with a longest span of 83 ft (25.3 m) and a deck 23 ft wide.

Who owns BLM Road over Cap Canal?

It is owned by the Other State Agency.