US Bridges

US 60 Eb; FAP 022 over New River

Fair

Maricopa County, Arizona · 11.9 MI W JCT I 17 · Structure no. 00895

Built
1963
62 years old, rebuilt 2010
Condition
Fair
inspected July 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
361 ft
6 main spans
Daily traffic
28,814
2021 count
Owner
State
State Highway Agency

About this bridge

US 60 Eb; FAP 022 over New River is a prestressed concrete stringer/multi-beam or girder carrying US 60 Eb; FAP 022 over New River in Maricopa County, Arizona. It was built in 1963 and reconstructed in 2010, so it is 62 years old, older than the Arizona average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 28,814 vehicles a day, roughly 9% of them trucks, projected to reach 28,824 by 2041. The structure is 361 ft (110 m) long and 51 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesUS 60 Eb; FAP 022
CrossesNew River
Location11.9 MI W JCT I 17
RouteU.S. Route 60
StateArizona
Coordinates33.5949, -112.2632
Functional classUrban Other Principal Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourCountermeasures installed to correct a previously existing problem
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating61 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans6
Design loadHS 20
Structure length361 ft (110 m)
Longest span60 ft (18.3 m)
Deck width51 ft (15.4 m)
Roadway width43 ft (13.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic28,814 (2021)
Projected traffic28,824 by 2041
Trucks9%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$2,000 (2022 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was US 60 Eb; FAP 022 over New River built?

It was built in 1963, making it 62 years old in 2025. It was reconstructed in 2010.

What condition is US 60 Eb; FAP 022 over New River in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.

How much traffic does US 60 Eb; FAP 022 over New River carry?

About 28,814 vehicles per day (2021 count), of which roughly 9% are trucks.

How long is US 60 Eb; FAP 022 over New River?

The structure is 361 ft (110 m) long with a longest span of 60 ft (18.3 m) and a deck 51 ft wide.

Who owns US 60 Eb; FAP 022 over New River?

It is owned by the State Highway Agency.