SR 75 over Sanders Wash
FairGreenlee County, Arizona · 9.7 MI S JCT US 191 · Structure no. 00202
- Built
- 1938
- 87 years old, rebuilt 1965
- Condition
- Fair
- inspected August 2023
- Type
- Slab
- Concrete Continuous
- Length
- 112 ft
- 4 main spans
- Daily traffic
- 1,040
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
SR 75 over Sanders Wash is a concrete continuous slab carrying SR 75 over Sanders Wash in Greenlee County, Arizona. It was built in 1938 and reconstructed in 1965, so it is 87 years old, older than the Arizona average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,040 vehicles a day, roughly 28% of them trucks, projected to reach 1,050 by 2042. The structure is 112 ft (34.1 m) long and 36 ft wide. If it were closed, the detour would be 34.2 mi (55 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 75 over Sanders Wash built?
It was built in 1938, making it 87 years old in 2025. It was reconstructed in 1965.
What condition is SR 75 over Sanders Wash in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.
How much traffic does SR 75 over Sanders Wash carry?
About 1,040 vehicles per day (2022 count), of which roughly 28% are trucks.
How long is SR 75 over Sanders Wash?
The structure is 112 ft (34.1 m) long with a longest span of 25 ft (7.6 m) and a deck 36 ft wide.
Who owns SR 75 over Sanders Wash?
It is owned by the State Highway Agency.