Hackney Ave over Graveyard Wash
FairPosted for loadGila County, Arizona · 300 Ft SW JCT US 60 · Structure no. 09709
- Built
- 1916
- 109 years old
- Condition
- Fair
- inspected May 2024
- Type
- Slab
- Concrete
- Length
- 24 ft
- 1 main span
- Daily traffic
- 1,188
- 2021 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Hackney Ave over Graveyard Wash is a concrete slab carrying Hackney Ave over Graveyard Wash in Gila County, Arizona. It was built in 1916, so it is 109 years old, older than the Arizona average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 1,188 vehicles a day, roughly 1% of them trucks, projected to reach 1,198 by 2041. The structure is 24 ft (7.3 m) long and 24 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Hackney Ave over Graveyard Wash built?
It was built in 1916, making it 109 years old in 2025.
What condition is Hackney Ave over Graveyard Wash in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.
How much traffic does Hackney Ave over Graveyard Wash carry?
About 1,188 vehicles per day (2021 count), of which roughly 1% are trucks.
How long is Hackney Ave over Graveyard Wash?
The structure is 24 ft (7.3 m) long with a longest span of 21 ft (6.4 m) and a deck 24 ft wide.
Who owns Hackney Ave over Graveyard Wash?
It is owned by the City or Municipal Highway Agency.