US Bridges

FSR 64 over Creek

Fair

Gila County, Arizona · 1 MI E/O Dude Ff Mem · Structure no. 031204000015897

Built
2011
14 years old
Condition
Fair
inspected August 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
40 ft
1 main span
Daily traffic
499
2021 count
Owner
Federal
U.S. Forest Service

About this bridge

FSR 64 over Creek is a prestressed concrete box beam or girders - multiple carrying FSR 64 over Creek in Gila County, Arizona. It was built in 2011, so it is 14 years old, younger than the Arizona average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 499 vehicles a day, roughly 10% of them trucks, projected to reach 599 by 2042. The structure is 40 ft (12.3 m) long and 28 ft wide. If it were closed, the detour would be 24.9 mi (40 km).

CarriesFSR 64
CrossesCreek
Location1 MI E/O Dude Ff Mem
RouteFederal Lands Road 64
StateArizona
Coordinates34.36747, -111.21903
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating63.6 US tons
Inventory rating48.9 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length40 ft (12.3 m)
Longest span37 ft (11.4 m)
Deck width28 ft (8.5 m)
Roadway width25 ft (7.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic499 (2021)
Projected traffic599 by 2042
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed24.9 mi (40 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerU.S. Forest Service
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FSR 64 over Creek built?

It was built in 2011, making it 14 years old in 2025.

What condition is FSR 64 over Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.

How much traffic does FSR 64 over Creek carry?

About 499 vehicles per day (2021 count), of which roughly 10% are trucks.

How long is FSR 64 over Creek?

The structure is 40 ft (12.3 m) long with a longest span of 37 ft (11.4 m) and a deck 28 ft wide.

Who owns FSR 64 over Creek?

It is owned by the U.S. Forest Service and maintained by the County Highway Agency.