US Bridges

IRR BIA RTE N15 over Little Colorado River

Fair

Coconino County, Arizona · 1 MI East of Leupp · Structure no. 00000000000N315

Built
1977
48 years old
Condition
Fair
inspected March 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
562 ft
7 main spans
Daily traffic
2,786
2023 count
Owner
Federal
Bureau of Indian Affairs

About this bridge

IRR BIA RTE N15 over Little Colorado River is a prestressed concrete continuous stringer/multi-beam or girder carrying IRR BIA RTE N15 over Little Colorado River in Coconino County, Arizona. It was built in 1977, so it is 48 years old, older than the Arizona average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 2,786 vehicles a day, roughly 10% of them trucks, projected to reach 4,680 by 2043. The structure is 562 ft (171.4 m) long and 35 ft wide. If it were closed, the detour would be 6.2 mi (10 km).

CarriesIRR BIA RTE N15
CrossesLittle Colorado River
Location1 MI East of Leupp
RouteFederal Lands Road 0N15
StateArizona
Coordinates35.30114, -110.98936
Functional classRural Major Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating49.1 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans7
Design loadHS 20
Structure length562 ft (171.4 m)
Longest span80 ft (24.4 m)
Deck width35 ft (10.6 m)
Roadway width34 ft (10.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,786 (2023)
Projected traffic4,680 by 2043
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerBureau of Indian Affairs
Maintained byBureau of Indian Affairs
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was IRR BIA RTE N15 over Little Colorado River built?

It was built in 1977, making it 48 years old in 2025.

What condition is IRR BIA RTE N15 over Little Colorado River in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.

How much traffic does IRR BIA RTE N15 over Little Colorado River carry?

About 2,786 vehicles per day (2023 count), of which roughly 10% are trucks.

How long is IRR BIA RTE N15 over Little Colorado River?

The structure is 562 ft (171.4 m) long with a longest span of 80 ft (24.4 m) and a deck 35 ft wide.

Who owns IRR BIA RTE N15 over Little Colorado River?

It is owned by the Bureau of Indian Affairs.