US Bridges

FSR 42F over Cave Creek

Good

Cochise County, Arizona · 3.5 MI Sw/O Portal Fire & · Structure no. 030501000003023

Built
2004
21 years old
Condition
Good
inspected August 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
70 ft
1 main span
Daily traffic
80
2022 count
Owner
Federal
U.S. Forest Service

About this bridge

FSR 42F over Cave Creek is a steel stringer/multi-beam or girder carrying FSR 42F over Cave Creek in Cochise County, Arizona. It was built in 2004, so it is 21 years old, younger than the Arizona average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 80 vehicles a day, projected to reach 150 by 2042. The structure is 70 ft (21.3 m) long and 16 ft wide. If it were closed, the detour would be 98.2 mi (158 km).

CarriesFSR 42F
CrossesCave Creek
Location3.5 MI Sw/O Portal Fire &
RouteFederal Lands Road 42-F
StateArizona
Coordinates31.88403, -109.17796
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment3: Basically intolerable, requiring high priority of corrective action
Operating rating47.5 US tons
Inventory rating36.4 US tons

Structure

MaterialSteel
DeckCorrugated steel
Main spans1
Design loadHS 20
Structure length70 ft (21.3 m)
Longest span66 ft (20 m)
Deck width16 ft (5 m)
Roadway width16 ft (4.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic80 (2022)
Projected traffic150 by 2042
Trucks—
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed98.2 mi (158 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerU.S. Forest Service
Maintained byU.S. Forest Service
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FSR 42F over Cave Creek built?

It was built in 2004, making it 21 years old in 2025.

What condition is FSR 42F over Cave Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does FSR 42F over Cave Creek carry?

About 80 vehicles per day (2022 count).

How long is FSR 42F over Cave Creek?

The structure is 70 ft (21.3 m) long with a longest span of 66 ft (20 m) and a deck 16 ft wide.

Who owns FSR 42F over Cave Creek?

It is owned by the U.S. Forest Service.