Park Road over Puerco River
FairApache County, Arizona · 10.78 Miles South of I-40 · Structure no. 8430002P0000000
- Built
- 1990
- 35 years old
- Condition
- Fair
- inspected April 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 512 ft
- 4 main spans
- Daily traffic
- 2,000
- 2019 count
- Owner
- Federal
- National Park Service
About this bridge
Park Road over Puerco River is a prestressed concrete stringer/multi-beam or girder carrying Park Road over Puerco River in Apache County, Arizona. It was built in 1990, so it is 35 years old, younger than the Arizona average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 2,000 vehicles a day, roughly 1% of them trucks, projected to reach 3,000 by 2039. The structure is 512 ft (156.1 m) long and 34 ft wide. If it were closed, the detour would be 80.2 mi (129 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Park Road over Puerco River built?
It was built in 1990, making it 35 years old in 2025.
What condition is Park Road over Puerco River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.
How much traffic does Park Road over Puerco River carry?
About 2,000 vehicles per day (2019 count), of which roughly 1% are trucks.
How long is Park Road over Puerco River?
The structure is 512 ft (156.1 m) long with a longest span of 129 ft (39.3 m) and a deck 34 ft wide.
Who owns Park Road over Puerco River?
It is owned by the National Park Service.