IRR BIA RTE 8008 over Lukachukai Wash
GoodApache County, Arizona · 1.1KM East of Ush 191 · Structure no. 0000N32780B0268
- Built
- 2018
- 7 years old, rebuilt 9999
- Condition
- Good
- inspected April 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 584 ft
- 6 main spans
- Daily traffic
- 300
- 2023 count
- Owner
- Federal
- Bureau of Indian Affairs
About this bridge
IRR BIA RTE 8008 over Lukachukai Wash is a steel continuous stringer/multi-beam or girder carrying IRR BIA RTE 8008 over Lukachukai Wash in Apache County, Arizona. It was built in 2018 and reconstructed in 9999, so it is 7 years old, younger than the Arizona average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 300 vehicles a day, roughly 10% of them trucks, projected to reach 400 by 2043. The structure is 584 ft (177.9 m) long and 31 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IRR BIA RTE 8008 over Lukachukai Wash built?
It was built in 2018, making it 7 years old in 2025. It was reconstructed in 9999.
What condition is IRR BIA RTE 8008 over Lukachukai Wash in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.
How much traffic does IRR BIA RTE 8008 over Lukachukai Wash carry?
About 300 vehicles per day (2023 count), of which roughly 10% are trucks.
How long is IRR BIA RTE 8008 over Lukachukai Wash?
The structure is 584 ft (177.9 m) long with a longest span of 98 ft (29.8 m) and a deck 31 ft wide.
Who owns IRR BIA RTE 8008 over Lukachukai Wash?
It is owned by the Bureau of Indian Affairs.