US Bridges

IRR BIA RTE N172 over Lukachukai Wash

Good

Apache County, Arizona · At Round Rock Day School · Structure no. 00000000000N518

Built
1977
48 years old
Condition
Good
inspected April 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
210 ft
3 main spans
Daily traffic
385
2023 count
Owner
Federal
Bureau of Indian Affairs

About this bridge

IRR BIA RTE N172 over Lukachukai Wash is a prestressed concrete stringer/multi-beam or girder carrying IRR BIA RTE N172 over Lukachukai Wash in Apache County, Arizona. It was built in 1977, so it is 48 years old, older than the Arizona average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 385 vehicles a day, roughly 5% of them trucks, projected to reach 450 by 2040. The structure is 210 ft (63.9 m) long and 31 ft wide. If it were closed, the detour would be 8.7 mi (14 km).

CarriesIRR BIA RTE N172
CrossesLukachukai Wash
LocationAt Round Rock Day School
RouteFederal Lands Road 0N172
StateArizona
Coordinates36.51369, -109.47186
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment5: Somewhat better than minimum adequacy to tolerate being left in place as is
Operating rating49.1 US tons
Inventory rating35.9 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length210 ft (63.9 m)
Longest span70 ft (21.3 m)
Deck width31 ft (9.5 m)
Roadway width30 ft (9.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic385 (2023)
Projected traffic450 by 2040
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed8.7 mi (14 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerBureau of Indian Affairs
Maintained byBureau of Indian Affairs
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was IRR BIA RTE N172 over Lukachukai Wash built?

It was built in 1977, making it 48 years old in 2025.

What condition is IRR BIA RTE N172 over Lukachukai Wash in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.

How much traffic does IRR BIA RTE N172 over Lukachukai Wash carry?

About 385 vehicles per day (2023 count), of which roughly 5% are trucks.

How long is IRR BIA RTE N172 over Lukachukai Wash?

The structure is 210 ft (63.9 m) long with a longest span of 70 ft (21.3 m) and a deck 31 ft wide.

Who owns IRR BIA RTE N172 over Lukachukai Wash?

It is owned by the Bureau of Indian Affairs.