IRR BIA RTE N7 over Nazlini Wash
FairApache County, Arizona · On Route 7 in Chinle · Structure no. 00000000000N546
- Built
- 1996
- 29 years old, rebuilt 9999
- Condition
- Fair
- inspected April 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 260 ft
- 3 main spans
- Daily traffic
- 12,780
- 2023 count
- Owner
- Federal
- Bureau of Indian Affairs
About this bridge
IRR BIA RTE N7 over Nazlini Wash is a prestressed concrete stringer/multi-beam or girder carrying IRR BIA RTE N7 over Nazlini Wash in Apache County, Arizona. It was built in 1996 and reconstructed in 9999, so it is 29 years old, younger than the Arizona average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 12,780 vehicles a day, roughly 15% of them trucks, projected to reach 35,100 by 2040. The structure is 260 ft (79.3 m) long and 62 ft wide. If it were closed, the detour would be 34.8 mi (56 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IRR BIA RTE N7 over Nazlini Wash built?
It was built in 1996, making it 29 years old in 2025. It was reconstructed in 9999.
What condition is IRR BIA RTE N7 over Nazlini Wash in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.
How much traffic does IRR BIA RTE N7 over Nazlini Wash carry?
About 12,780 vehicles per day (2023 count), of which roughly 15% are trucks.
How long is IRR BIA RTE N7 over Nazlini Wash?
The structure is 260 ft (79.3 m) long with a longest span of 86 ft (26.2 m) and a deck 62 ft wide.
Who owns IRR BIA RTE N7 over Nazlini Wash?
It is owned by the Bureau of Indian Affairs.