US Bridges

I-30 Log 113.64 over U.S. 67

Good

Saline County, Arkansas · 3 MI SW SH 5 Benton · Structure no. 0000000000A7411

Built
2022
3 years old
Condition
Good
inspected February 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
153 ft
1 main span
Daily traffic
39,000
2020 count
Owner
State
State Highway Agency

About this bridge

I-30 Log 113.64 over U.S. 67 is a steel stringer/multi-beam or girder carrying I-30 Log 113.64 over U.S. 67 in Saline County, Arkansas. It was built in 2022, so it is 3 years old, younger than the Arkansas average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 39,000 vehicles a day, roughly 24% of them trucks, projected to reach 46,800 by 2040. The structure is 153 ft (46.6 m) long and 73 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI-30 Log 113.64
CrossesU.S. 67
Location3 MI SW SH 5 Benton
RouteInterstate 30
Coordinates34.54497, -92.63129
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation9: Superior to present desirable criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length153 ft (46.6 m)
Longest span148 ft (45.1 m)
Deck width73 ft (22.4 m)
Roadway width71 ft (21.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic39,000 (2020)
Projected traffic46,800 by 2040
Trucks24%
Lanes on structure4
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-30 Log 113.64 over U.S. 67 built?

It was built in 2022, making it 3 years old in 2025.

What condition is I-30 Log 113.64 over U.S. 67 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does I-30 Log 113.64 over U.S. 67 carry?

About 39,000 vehicles per day (2020 count), of which roughly 24% are trucks.

How long is I-30 Log 113.64 over U.S. 67?

The structure is 153 ft (46.6 m) long with a longest span of 148 ft (45.1 m) and a deck 73 ft wide.

Who owns I-30 Log 113.64 over U.S. 67?

It is owned by the State Highway Agency.