I 440-SEC 1 WB over I30 SH365 Frazier Fourch
FairPulaski County, Arkansas · So Terminal-Ew Ramp · Structure no. 0000000000A5700
- Built
- 1977
- 48 years old
- Condition
- Fair
- inspected February 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 12,089 ft
- 197 main spans
- Daily traffic
- 18,000
- 2018 count
- Owner
- State
- State Highway Agency
About this bridge
I 440-SEC 1 WB over I30 SH365 Frazier Fourch is a steel continuous stringer/multi-beam or girder carrying I 440-SEC 1 WB over I30 SH365 Frazier Fourch in Pulaski County, Arkansas. It was built in 1977, so it is 48 years old, older than the Arkansas average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 18,000 vehicles a day, roughly 1% of them trucks, projected to reach 34,997 by 2028. The structure is 12,089 ft (3,684.7 m) long and 59 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I 440-SEC 1 WB over I30 SH365 Frazier Fourch built?
It was built in 1977, making it 48 years old in 2025.
What condition is I 440-SEC 1 WB over I30 SH365 Frazier Fourch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.
How much traffic does I 440-SEC 1 WB over I30 SH365 Frazier Fourch carry?
About 18,000 vehicles per day (2018 count), of which roughly 1% are trucks.
How long is I 440-SEC 1 WB over I30 SH365 Frazier Fourch?
The structure is 12,089 ft (3,684.7 m) long with a longest span of 150 ft (45.7 m) and a deck 59 ft wide.
Who owns I 440-SEC 1 WB over I30 SH365 Frazier Fourch?
It is owned by the State Highway Agency.