US Bridges

Jx Conway RD over Bayou Meto Relief

Good

Pulaski County, Arkansas · .9 MI W SH 107 · Structure no. 000000000023702

Built
2013
12 years old
Condition
Good
inspected October 2023
Type
Culvert
Concrete
Length
28 ft
2 main spans
Daily traffic
2,106
2018 count
Owner
County
County Highway Agency

About this bridge

Jx Conway RD over Bayou Meto Relief is a concrete culvert carrying Jx Conway RD over Bayou Meto Relief in Pulaski County, Arkansas. It was built in 2013, so it is 12 years old, younger than the Arkansas average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,106 vehicles a day, roughly 1% of them trucks, projected to reach 2,273 by 2007. The structure is 28 ft (8.5 m) long and 24 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesJx Conway RD
CrossesBayou Meto Relief
Location.9 MI W SH 107
RouteCounty Highway 910
Coordinates34.93013, -92.18407
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating35.1 US tons
Inventory rating21.1 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadUnknown
Structure length28 ft (8.5 m)
Longest span12 ft (3.7 m)
Deck width24 ft (7.3 m)
Roadway width21 ft (6.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,106 (2018)
Projected traffic2,273 by 2007
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Jx Conway RD over Bayou Meto Relief built?

It was built in 2013, making it 12 years old in 2025.

What condition is Jx Conway RD over Bayou Meto Relief in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does Jx Conway RD over Bayou Meto Relief carry?

About 2,106 vehicles per day (2018 count), of which roughly 1% are trucks.

How long is Jx Conway RD over Bayou Meto Relief?

The structure is 28 ft (8.5 m) long with a longest span of 12 ft (3.7 m) and a deck 24 ft wide.

Who owns Jx Conway RD over Bayou Meto Relief?

It is owned by the County Highway Agency.